{"id":81025,"date":"2022-09-26T03:59:49","date_gmt":"2022-09-26T03:59:49","guid":{"rendered":"https:\/\/globalroadtechnology.com\/\/?p=81025"},"modified":"2022-09-26T04:16:21","modified_gmt":"2022-09-26T04:16:21","slug":"lake-maitland-uranium-lower-capex-estimate","status":"publish","type":"post","link":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/","title":{"rendered":"Lake Maitland Uranium&#8217;s lower CAPEX estimate gives Toro a financial boost.\u00a0"},"content":{"rendered":"<p><span style=\"font-weight: 400\">Toro Energy has announced a lower CAPEX estimation for their proposed Uranium-Vanadium stand-alone project at Lake Maitland, from the recent scoping level estimation carried out by SKR Consulting Australasia and Strategic Metallurgy. Upon completion, the estimation came out $45 million lower than the previous estimate, which was completed ten years ago, for a total of $270 million.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">This sets the project up as a viable independent operation, with an expected production of 23.5 million pounds (Mlbs) of U308 and 12.2 Mlbs or V205. This adds considerably to the Wiluna Uranium operation and has a similar life of mine.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The new figure provides the company\u2019s Wiluna Uranium project with favourable conditions for financing and construction and is a result of an enhanced technical and financial feasibility assessment through the redesign of the processing flowsheet and plant.\u00a0 The globally significant asset is a major focus for Toro who are looking at the long-term feasibility of <a href=\"https:\/\/globalroadtechnology.com\/\/uranium-mining-australia-history-top-locations-companies\/\">uranium production<\/a> within a strengthening market.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The redesigned processing flowsheet has found improvements in dealing with the high clay content lithologies, which enables a more efficient process for the clay-dominant Lake Maitland deposit. The project includes a processing plant, power plant, bore field and reverse osmosis desalination plant.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Toro Energy Executive Chairman Richard Homsany said,<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cWe are delighted to release a very competitive US$202.5 million CAPEX estimate for our proposed Lake Maitland Uranium-Vanadium operation.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cThe US$202.5 million CAPEX for Lake Maitland compared to the CAPEX estimation of AUS$315 million for the entire Wiluna Uranium Project prepared almost 10 years ago is an outstanding result given inflationary pressures, and significantly improves the economics of the entire project.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">He added that further optionality and economic upside exist for Toro given the proximity to Lake Maitland of the Centipede, Millipede and Lake Way uranium deposits that could increase the production of uranium and vanadium.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cWe look forward to announcing the C1 operationToro Eneal expenditure estimate from the scoping study, which is expected to be completed soon,\u201d he concluded.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Australia has \u2018widespread uranium- and thorium-bearing mineral deposits\u201d, with the Olympic Dam in South Australia holding the largest uranium deposit in the world.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">As well as the Wiluna project, The Australian Vanadium Project in the Murchison Province approximately 43kms south of Meekatharra in Western Australia is an exciting new development site. This project covers approximately 200 sq km of 15 tenements and is 100% owned by Australian Vanadium Limited (AVL). The total Mineral Resource is 239Mt at 0.73% vanadium pentoxide (V2O5). The site also holds deposits of cobalt, nickel, and copper.\u00a0<\/span><\/p>\n<h3><span style=\"font-weight: 400\">References\u00a0<\/span><\/h3>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><span style=\"font-weight: 400\">https:\/\/www.listcorp.com\/asx\/toe\/toro-energy-limited\/news\/capex-for-lake-maitland-uranium-vanadium-operation-2767298.html<\/span><\/p>\n<p><span style=\"font-weight: 400\">https:\/\/www.australianvanadium.com.au\/our-assets\/the-australian-vanadium-project\/#:~:text=The%20Australian%20Vanadium%20Project%20consists,the%20port%20city%20of%20Geraldton<\/span><span style=\"font-weight: 400\">.<\/span><\/p>\n<p><span style=\"font-weight: 400\">https:\/\/www.ga.gov.au\/digital-publication\/aecr2021\/uranium-and-thorium#:~:text=In%202019%2C%20Australia%20had%20three,mines%20in%202014%20and%202015<\/span><\/p>\n<p>Your feedback is important to us. If you enjoyed reading this Global Road Technology industry update and found it informative, please let us know by leaving a\u00a0<a href=\"https:\/\/www.google.com\/search?q=global+road+technology&amp;rlz=1C5CHFA_enAU752AU752&amp;oq=global&amp;aqs=chrome.0.69i59j69i57j0l3j69i60l3.3319j0j7&amp;sourceid=chrome&amp;ie=UTF-8#lrd=0x6b916abf12666337:0x815ee63ce3f411ba,1,,,\">REVIEW.<\/a><\/p>\n<p>Author \u2013\u00a0<a href=\"https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/\">Troy Adams<\/a>, Global Road Technology<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toro Energy has announced a lower CAPEX estimation for their proposed Uranium-Vanadium stand-alone project at Lake Maitland, from the recent [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":81026,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[115],"tags":[],"class_list":["post-81025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-articles"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost<\/title>\n<meta name=\"description\" content=\"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost\" \/>\n<meta property=\"og:description\" content=\"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/\" \/>\n<meta property=\"og:site_name\" content=\"GRT\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-26T03:59:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-09-26T04:16:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Troy Adams\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Troy Adams\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/\",\"url\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/\",\"name\":\"Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost\",\"isPartOf\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg\",\"datePublished\":\"2022-09-26T03:59:49+00:00\",\"dateModified\":\"2022-09-26T04:16:21+00:00\",\"author\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\"},\"description\":\"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.\",\"breadcrumb\":{\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg\",\"width\":1000,\"height\":667,\"caption\":\"Lake Maitland Uranium's lower CAPEX estimate gives Toro a financial boost.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/globalroadtechnology.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lake Maitland Uranium&#8217;s lower CAPEX estimate gives Toro a financial boost.\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/globalroadtechnology.com\/#website\",\"url\":\"https:\/\/globalroadtechnology.com\/\",\"name\":\"GRT\",\"description\":\"Dust Control and Soil Stabilization\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/globalroadtechnology.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\",\"name\":\"Troy Adams\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"caption\":\"Troy Adams\"},\"description\":\"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.\",\"sameAs\":[\"https:\/\/globalroadtechnology.com\/\/\",\"https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/\"],\"url\":\"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost","description":"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/","og_locale":"en_US","og_type":"article","og_title":"Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost","og_description":"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.","og_url":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/","og_site_name":"GRT","article_published_time":"2022-09-26T03:59:49+00:00","article_modified_time":"2022-09-26T04:16:21+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg","type":"image\/jpeg"}],"author":"Troy Adams","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Troy Adams","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/","url":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/","name":"Lake Maitland Uranium lower CAPEX estimate gives Toro a financial boost","isPartOf":{"@id":"https:\/\/globalroadtechnology.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage"},"image":{"@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage"},"thumbnailUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg","datePublished":"2022-09-26T03:59:49+00:00","dateModified":"2022-09-26T04:16:21+00:00","author":{"@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1"},"description":"Toro Energy has set their eyes on the Uranium energy mine of Australia and successfully set up an independent operation.","breadcrumb":{"@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#primaryimage","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/lake-maitland-uranium.jpeg","width":1000,"height":667,"caption":"Lake Maitland Uranium's lower CAPEX estimate gives Toro a financial boost."},{"@type":"BreadcrumbList","@id":"https:\/\/globalroadtechnology.com\/lake-maitland-uranium-lower-capex-estimate\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/globalroadtechnology.com\/"},{"@type":"ListItem","position":2,"name":"Lake Maitland Uranium&#8217;s lower CAPEX estimate gives Toro a financial boost.\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/globalroadtechnology.com\/#website","url":"https:\/\/globalroadtechnology.com\/","name":"GRT","description":"Dust Control and Soil Stabilization","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/globalroadtechnology.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1","name":"Troy Adams","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","caption":"Troy Adams"},"description":"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.","sameAs":["https:\/\/globalroadtechnology.com\/\/","https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/"],"url":"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/"}]}},"_links":{"self":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/81025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/comments?post=81025"}],"version-history":[{"count":0,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/81025\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media\/81026"}],"wp:attachment":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media?parent=81025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/categories?post=81025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/tags?post=81025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}