{"id":80994,"date":"2022-09-12T02:04:46","date_gmt":"2022-09-12T02:04:46","guid":{"rendered":"https:\/\/globalroadtechnology.com\/\/?p=80994"},"modified":"2023-06-27T06:13:41","modified_gmt":"2023-06-27T06:13:41","slug":"norseman-gold-project-processing-plant-reaches-completion","status":"publish","type":"post","link":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/","title":{"rendered":"Norseman Gold Project processing plant reaches completion"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">High-grade Australian gold producer <a href=\"https:\/\/www.pantoro.com.au\/projects\/norseman-project\/\">Pantoro<\/a> (PNR) announced this week that its one million tonnes per annum processing plant at Norseman Gold Project had reached practical completion, with ore commissioning of the plant now underway. Contractor GR Engineering was pleased to announce that the project was completed on time and on budget.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">PNR acquired 50% of the Norseman Gold Project, located in WA\u2019s eastern goldfields 200 km south of <a href=\"https:\/\/globalroadtechnology.com\/\/location\/dust-suppression-kalgoorlie-boulder-6430\/\">Kalgoorlie<\/a>, in 2019 and manages the unincorporated joint venture, including day to day operational management. The project holds 4.8 million ounces of gold with an ore reserve of 973,000 ounces and is comprised of pre-1994 \u2018near-continguous mining tenements including 800 km<\/span><span style=\"font-weight: 400;\">2<\/span><span style=\"font-weight: 400;\"> of Norseman-Wiluna highly prospective greenstone belt\u2019. Six mining areas were initially planned for the project, either underground or open pit. The mines have produced over 5.5m ounces of gold since first opening in 1935.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Production is planned to begin in the third quarter of this year.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Scotia Mining Centre, delivering a 776% upgrade in underground or reserves in April this year, and OK Underground Mine activities continue with \u2018around 140,000 tonnes available for milling\u2019.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Managing Director of PNR, Paul Cmrlec commended GR Engineering\u2019s outstanding performance in delivering the project on budget and on time, \u2018considering the recent cost increases and delays experienced across the wider industry\u2019. He also thanked and congratulated the team at Pantoro for their substantial efforts to stay on track and hit the objective.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The completion of the processing plant comes on the back of pleasing drilling results at PNR\u2019s Lamboo PGE project. PGE stands for platinum group metals that include <\/span><span style=\"font-weight: 400;\">platinum, palladium, rhodium, ruthenium, iridium, and osmium. The Edison Zone returned strong PGE results with nickel, cobalt, rhodium and iridium also present. The drilling programme, which began in April 2022, is ongoing, with confirmed \u2018large ore widths and consistent grades over long distances.\u2019<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Pantoro also own and operate the Halls Creek Project in WA, which they developed to first gold pour in 2015. The project consists <\/span><span style=\"font-weight: 400;\">of \u2018<a href=\"https:\/\/globalroadtechnology.com\/\/australian-underground-mines\/\">underground<\/a> and open pit mining, and a modern CIP processing facility\u2019.\u00a0<\/span><\/p>\n<p>Your feedback is important to us. If you enjoyed reading this Global Road Technology industry update and found it informative, please let us know by leaving a\u00a0<a href=\"https:\/\/www.google.com\/search?q=global+road+technology&amp;rlz=1C5CHFA_enAU752AU752&amp;oq=global&amp;aqs=chrome.0.69i59j69i57j0l3j69i60l3.3319j0j7&amp;sourceid=chrome&amp;ie=UTF-8#lrd=0x6b916abf12666337:0x815ee63ce3f411ba,1,,,\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.google.com\/search?q%3Dglobal%2Broad%2Btechnology%26rlz%3D1C5CHFA_enAU752AU752%26oq%3Dglobal%26aqs%3Dchrome.0.69i59j69i57j0l3j69i60l3.3319j0j7%26sourceid%3Dchrome%26ie%3DUTF-8%23lrd%3D0x6b916abf12666337:0x815ee63ce3f411ba,1,,,&amp;source=gmail&amp;ust=1591066480474000&amp;usg=AFQjCNF6wJqOTeD4PE2mN6Xq_dUuW81B4Q\">REVIEW.<\/a><\/p>\n<p>Author \u2013\u00a0<a href=\"https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/\">Troy Adams<\/a>, Global Road Technology<\/p>\n","protected":false},"excerpt":{"rendered":"<p>High-grade Australian gold producer Pantoro (PNR) announced this week that its one million tonnes per annum processing plant at Norseman [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":80995,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[115],"tags":[],"class_list":["post-80994","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-articles"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Norseman Gold Project Reaches Completion | GRT<\/title>\n<meta name=\"description\" content=\"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Norseman Gold Project Reaches Completion | GRT\" \/>\n<meta property=\"og:description\" content=\"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/\" \/>\n<meta property=\"og:site_name\" content=\"GRT\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-12T02:04:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-27T06:13:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"667\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Troy Adams\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Troy Adams\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/\",\"url\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/\",\"name\":\"Norseman Gold Project Reaches Completion | GRT\",\"isPartOf\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg\",\"datePublished\":\"2022-09-12T02:04:46+00:00\",\"dateModified\":\"2023-06-27T06:13:41+00:00\",\"author\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\"},\"description\":\"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.\",\"breadcrumb\":{\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg\",\"width\":1000,\"height\":667,\"caption\":\"Norseman Gold Project processing plant reaches completion\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/globalroadtechnology.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Norseman Gold Project processing plant reaches completion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/globalroadtechnology.com\/#website\",\"url\":\"https:\/\/globalroadtechnology.com\/\",\"name\":\"GRT\",\"description\":\"Dust Control and Soil Stabilization\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/globalroadtechnology.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\",\"name\":\"Troy Adams\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"caption\":\"Troy Adams\"},\"description\":\"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.\",\"sameAs\":[\"https:\/\/globalroadtechnology.com\/\/\",\"https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/\"],\"url\":\"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Norseman Gold Project Reaches Completion | GRT","description":"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/","og_locale":"en_US","og_type":"article","og_title":"Norseman Gold Project Reaches Completion | GRT","og_description":"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.","og_url":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/","og_site_name":"GRT","article_published_time":"2022-09-12T02:04:46+00:00","article_modified_time":"2023-06-27T06:13:41+00:00","og_image":[{"width":1000,"height":667,"url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg","type":"image\/jpeg"}],"author":"Troy Adams","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Troy Adams","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/","url":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/","name":"Norseman Gold Project Reaches Completion | GRT","isPartOf":{"@id":"https:\/\/globalroadtechnology.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage"},"image":{"@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage"},"thumbnailUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg","datePublished":"2022-09-12T02:04:46+00:00","dateModified":"2023-06-27T06:13:41+00:00","author":{"@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1"},"description":"Gold producer Pantoro announced this week that its processing plant at Norseman Gold Project had reached practical completion.","breadcrumb":{"@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#primaryimage","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2022\/09\/norseman-gold-project-processing-plant.jpg","width":1000,"height":667,"caption":"Norseman Gold Project processing plant reaches completion"},{"@type":"BreadcrumbList","@id":"https:\/\/globalroadtechnology.com\/norseman-gold-project-processing-plant-reaches-completion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/globalroadtechnology.com\/"},{"@type":"ListItem","position":2,"name":"Norseman Gold Project processing plant reaches completion"}]},{"@type":"WebSite","@id":"https:\/\/globalroadtechnology.com\/#website","url":"https:\/\/globalroadtechnology.com\/","name":"GRT","description":"Dust Control and Soil Stabilization","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/globalroadtechnology.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1","name":"Troy Adams","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","caption":"Troy Adams"},"description":"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.","sameAs":["https:\/\/globalroadtechnology.com\/\/","https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/"],"url":"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/"}]}},"_links":{"self":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/80994","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/comments?post=80994"}],"version-history":[{"count":0,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/80994\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media\/80995"}],"wp:attachment":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media?parent=80994"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/categories?post=80994"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/tags?post=80994"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}