{"id":75046,"date":"2016-04-03T14:49:54","date_gmt":"2016-04-03T14:49:54","guid":{"rendered":"https:\/\/globalroadtechnology.com\/\/?p=75046"},"modified":"2023-06-27T23:42:12","modified_gmt":"2023-06-27T23:42:12","slug":"whole-of-life-costing","status":"publish","type":"post","link":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/","title":{"rendered":"Whole of Life Costing (WOLC) \u2013 Why is it so important?"},"content":{"rendered":"<h3>Whist the saying \u2018horses for courses\u2019 is synonymous with pavement design, the economic success is typically measured on the Whole of Life Costing and providing solutions to meet available current and future road expenditure budgets of the stakeholder.<\/h3>\n<p>The present worth of cost (PWOC) and Future worth of Cost (FWOC) are methods to account for varying financial principles including treasuring discount rates and inflation, both of which can affect the asset value and the anticipated maintenance costs over the life of the pavement.<\/p>\n<p>The process of accurately assessing the economic viability and the most appropriate pavement solution typically incorporates the structural design of a number of pavement configurations for the proposed design parameters, whether it is rigid or flexible in nature. This is generally followed by an assessment of the predominant distress mechanism, traffic loading, future growth and any financial implications as a result of remoteness or unavailability of material.<\/p>\n<p>For example, the most appropriate pavement configuration from a structural design perspective may not provide the best outcome in terms of WOLC \u2013 depending on site-specific considerations.<\/p>\n<p>When undertaking an economic analysis and WOLC, consideration should be given to:<\/p>\n<ol>\n<li><strong>Construction costs<\/strong> \u2013 the local unit costs and capabilities of contractors, need to be incorporated into each design option, particularly in remote locations and often can vary significantly based on geographical location, the presence of construction constraints and auxiliary works (i.e. hydraulic requirements, service crossings etc.) and consideration given to prevailing weather conditions and traffic control requirements.<\/li>\n<li><strong>Maintenance costs<\/strong> \u2013 the maintenance costs in present and cumulative future value needs to be addressed for each design option and needs to be assessed against future available budgets. It is recognized that flexible pavement will typically require increased maintenance costs over the design life, which may include routine and periodic maintenance expenditure.<\/li>\n<li><strong>Salvage Value<\/strong> \u2013 whilst often difficult to definitively assess, the salvage value of the asset at the end of the proposed design life can be determined by assessing items of residual life, including subgrade formations, existing geometric alignment (clearing, grubbing and site preparation), any opportunity in material recycling or stabilization and whether additional cost is required to dispose of existing pavement.<\/li>\n<\/ol>\n<p>It is recognized that this assessment can be subjective with regards to a number of variables including projected financial principles, traffic growth and anticipated construction and maintenance costs, however, it is considered a sound starting point and should be verified on local practice.<\/p>\n<p>For more information on Global Road Technology or whole of life costing (WOLC) please <a href=\"https:\/\/globalroadtechnology.com\/\/contact-grt\/\">contact us<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Whist the saying \u2018horses for courses\u2019 is synonymous with pavement design, the economic success is typically measured on the Whole [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":75031,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[115],"tags":[],"class_list":["post-75046","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-articles"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT<\/title>\n<meta name=\"description\" content=\"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT\" \/>\n<meta property=\"og:description\" content=\"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/\" \/>\n<meta property=\"og:site_name\" content=\"GRT\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-03T14:49:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-06-27T23:42:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Troy Adams\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Troy Adams\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/\",\"url\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/\",\"name\":\"Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT\",\"isPartOf\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg\",\"datePublished\":\"2016-04-03T14:49:54+00:00\",\"dateModified\":\"2023-06-27T23:42:12+00:00\",\"author\":{\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\"},\"description\":\"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.\",\"breadcrumb\":{\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#breadcrumb\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg\",\"width\":1000,\"height\":560,\"caption\":\"Long Life Asphalt Pavement \u2013 The Basics\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/globalroadtechnology.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Whole of Life Costing (WOLC) \u2013 Why is it so important?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/globalroadtechnology.com\/#website\",\"url\":\"https:\/\/globalroadtechnology.com\/\",\"name\":\"GRT\",\"description\":\"Dust Control and Soil Stabilization\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/globalroadtechnology.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1\",\"name\":\"Troy Adams\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AU\",\"@id\":\"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"contentUrl\":\"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg\",\"caption\":\"Troy Adams\"},\"description\":\"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.\",\"sameAs\":[\"https:\/\/globalroadtechnology.com\/\/\",\"https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/\"],\"url\":\"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT","description":"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/","og_locale":"en_US","og_type":"article","og_title":"Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT","og_description":"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.","og_url":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/","og_site_name":"GRT","article_published_time":"2016-04-03T14:49:54+00:00","article_modified_time":"2023-06-27T23:42:12+00:00","og_image":[{"width":1000,"height":560,"url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg","type":"image\/jpeg"}],"author":"Troy Adams","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Troy Adams","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/","url":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/","name":"Whole of Life Costing (WOLC) \u2013 Why is it so important? | GRT","isPartOf":{"@id":"https:\/\/globalroadtechnology.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage"},"image":{"@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage"},"thumbnailUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg","datePublished":"2016-04-03T14:49:54+00:00","dateModified":"2023-06-27T23:42:12+00:00","author":{"@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1"},"description":"Economic success of pavement design is measured on the Whole of Life Costing to meet road expenditure budgets of the stakeholder.","breadcrumb":{"@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#breadcrumb"},"inLanguage":"en-AU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/globalroadtechnology.com\/whole-of-life-costing\/"]}]},{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#primaryimage","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2018\/06\/03whole-of-life-costing-global-road-technology.jpg","width":1000,"height":560,"caption":"Long Life Asphalt Pavement \u2013 The Basics"},{"@type":"BreadcrumbList","@id":"https:\/\/globalroadtechnology.com\/whole-of-life-costing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/globalroadtechnology.com\/"},{"@type":"ListItem","position":2,"name":"Whole of Life Costing (WOLC) \u2013 Why is it so important?"}]},{"@type":"WebSite","@id":"https:\/\/globalroadtechnology.com\/#website","url":"https:\/\/globalroadtechnology.com\/","name":"GRT","description":"Dust Control and Soil Stabilization","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/globalroadtechnology.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AU"},{"@type":"Person","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/634efc2026d5462934990ffbab7984a1","name":"Troy Adams","image":{"@type":"ImageObject","inLanguage":"en-AU","@id":"https:\/\/globalroadtechnology.com\/#\/schema\/person\/image\/","url":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","contentUrl":"https:\/\/globalroadtechnology.com\/wp-content\/uploads\/2020\/12\/troy-150x150.jpeg","caption":"Troy Adams"},"description":"Troy Adams is the Managing Director of Global Road Technology (GRT) Specialising in Engineered Solutions for Dust Suppression, Erosion Control, Soil Stabilisation and Water Management. A pioneering, socially conscious Australian entrepreneur, Troy Adams is passionate about health and safety and providing innovative solutions that are cost-effective to the mining industry, governments and infrastructure sectors. Troy is also a tech investor, director of companies like Crossware, Boost, Hakkasan, Novikov and more.","sameAs":["https:\/\/globalroadtechnology.com\/\/","https:\/\/www.linkedin.com\/in\/troyadamsglobalroadtechnology\/"],"url":"https:\/\/globalroadtechnology.com\/author\/troy-adams-grt\/"}]}},"_links":{"self":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/75046","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/comments?post=75046"}],"version-history":[{"count":0,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/posts\/75046\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media\/75031"}],"wp:attachment":[{"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/media?parent=75046"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/categories?post=75046"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/globalroadtechnology.com\/wp-json\/wp\/v2\/tags?post=75046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}